Enter Title

Project Documents

Click to download below:

File Size PDF ZIP
       

Fallago Rig 2 Wind Farm & Fallago Rig Wind Farm Extension of Time - Public Inquiry: Annotated Photomontages

     
       
 Click here for link to documents      
       
Press Advert - Variation Notice 682KB 
 
Press Advert - Further Environmental Information
693KB
 
       

Further Environmental Information June 2016

     

Further Environmental Information June 2016

10MB

 

       
 

Fallago Rig Original Consent (2010) & Variation (2013)

     
 Fallago Rig Original Consent (2010) 277KB
 
 Fallago Rig Variation to Original Consent (2013) 114KB
 
       
 

Fallago Rig Original ES (2006) & SEI (2006-2010)

     
 Clink here for link to documents      
       
 

Fallago Rig Original Application (2005)

     
Click here for link to documents      
       

Fallago Rig 2 Scoping

     
Fallago Rig 2 Scoping Report
3.10MB
 
Community Consultation Day January 2015
4.07MB
 
Fallago Rig 2 Design Freeze Site Layout
716KB
 
Fallago Rig 2 Exhibition September 2015
2.65MB
 
       
 

Fallago Rig 2 S36 Application - Feb 2016

     
 Adverts      
S36 Fallago Rig advert Final 33KB
 
S36C Fallago Rig advert Final 29KB
 
       
Covers      
Cover Letter 1.46MB
 
S36 Application Letter 1.58MB
 
S36C Application Letter 1.85MB
 
       
Volume 1 - NTS      
Volume 1 Non-tec Summary 3.25MB
 
       
Volume 2 - ES      
Environmental Statement 8.54MB
 
       
Volume 3 - Figures - Chapter 1 - Introduction      
Proposed Development Location 4.92MB
 
Proposed Development Site 787KB
 
       
Volume 3 - Figures - Chapter 3 - Site Selection      
Site Layout and Constraints 1.01MB
 
Design Evo 7.32MB
 
       
Volume 3 - Figures - Chapter 4 - Project Description      
Proposed Development Layout 727KB
 
Typical Turbine Structure 51KB
 
Typical Road Construction 520KB
 
Typical Culvert 236KB
 
Typical Water Crossings 319KB
 
Indicative Turbine Foundation Design 388KB
 
Typical Crane Pad Hardstanding 354KB
 
Substation 815KB
 
Typical Cable Trench Cross Section 249KB
 
Indicative Primary Construction Compound Batch Plant 669KB
 
Indicative Batch Plant Arrangement 47KB
 
Indicative Construction Programme 3.40MB
 
Borrow Pit A 840KB
 
Borrow Pit B 1.03MB
 
       
Volume 3 - Figures - Chapter 7 - Landscape and Visual      
Figure 7.1 Landscape and Visual Study Area 35km 8.62MB
 
Figure 7.2a Zone of Theoretical Visibility to Blade Tip with vps 35km 7.51MB
 
Figure 7.2b Zone of Theoretical Visibility to Blade Tip with vps 10km
8.93MB
 
Figure 7.3 Zone of Theoretical Visibility to Hub Height 35km
7.36MB
 
Figure 7.4 Zone of Theoretical Visibility to Blade Tip with Viewpoints (35km radius)
4.14MB
 
Figure 7.5 Zone of Theoretical Visibility to Blade Tip with Viewpoints (20km radius)
5.61MB
 
Figure 7.6a Design Evolution Plan
1.82MB
 
Figure 7.6b Design Evolution Viewpoint 1) Harestone Hill
3.71MB
 
Figure 7.6c Design Evolution Viewpoint 2) Twin Law Cairn
4.89MB
 
Figure 7.6d Design Evolution Viewpoint 3) Priest Law Hill
4.02MB
 
Figure 7.6e Design Evolution Viewpoint 4) Gifford
3.36MB
 
Figure 7.6f Design Evolution Viewpoint 5) Lauder Common
5.87MB
 
Figure 7.6g Design Evolution Viewpoint 6) Oaktree Roundabout near Haddington
6.34MB
 
Figure 7.7a Landscape Character 35km
5.97MB
 
Figure 7.7b Detailed Landscape Character
6.73MB
 
Figure 7.8a Landscape Planning Designations 35km
6.17MB
 
Figure 7.8b Landscape Planning Designations
7.91MB
 
Figure 7.9a Recreational Routes
8.99MB
 
Figure 7.9b-f Southern upland Way Sequential Route Assessment A3
3.80MB
 
Figure 7.10a Cumulative Wind Farms within 60km
9.18MB
 
Figure 7.10b Cumulative Wind Farms within 35km
7.71MB
 
Figure 7.11a Cumulative ZTV1) Comparing Fallago Rig 1 and Fallago Rig 2 35km
8.59MB
 
Figure 7.11b Cumulative ZTV1) Comparing Fallago Rig 1 and Fallago Rig 2 35km
8.95MB
 
Figure 7.11c Cumulative ZTV1) Comparing Fallago Rig 1 and Fallago Rig 2 20km
5.63MB
 
Figure 7.12a Cumulative ZTV2) Fallago Rig & proposed Fallago Rig 2 Eastern Turbines 35km
8.65MB
 
Figure 7.12b Cumulative ZTV2) Fallago Rig & proposed Fallago Rig 2 Eastern Turbines 35km
8.90MB
 
Figure 7.12c Cumulative ZTV2) Fallago Rig & proposed Fallago Rig 2 Eastern Turbines 35km
8.63MB
 
Figure 7.12d Cumulative ZTV2) Fallago Rig & proposed Fallago Rig 2 Eastern Turbines 35km
8.95MB
 
Figure 7.13a Cumulative ZTV3) Fallago Rig, Dun Law & Crystal Rig, Aikengall Group 35km
8.70MB
 
Figure 7.13b Cumulative ZTV3) Fallago Rig, Dun Law & Crystal Rig, Aikengall Group 35km
8.96MB
 
Figure 7.14a Cumulative ZTV4) Fallago Rig, Black Hill, Longpark & Lauderdale 35km
7.38MB
 
Figure 7.14b Cumulative ZTV4) Fallago Rig, Black Hill, Longpark & Lauderdale 35km
9.11MB
 
Figure 7.15a Cumulative ZTV 5) Fallago Rig and Berwickshire Wind Energy Development 35km
9.34MB
 
Figure 7.15b Cumulative ZTV 5) Fallago Rig and Berwickshire Wind Energy Development 35km
9.09MB
 
Figure 7.16a Cumulative ZTV 6) Fallago Rig and East Lothian Wind Energy Development 35km
9.34MB
 
Figure 7.16b Cumulative ZTV 6) Fallago Rig and East Lothian Wind Energy Development 35km
8.55MB
 
Figure 7.17a Cumulative ZTV 7) Fallago Rig & Moorfoot Wind Energy Development 35km
8.70MB
 
Figure 7.17b Cumulative ZTV 7) Fallago Rig & Moorfoot Wind Energy Development 35km
8.88MB
 
Figure 7.18 Viewpoint 1) Meikle Says Law - Photomontage
5.57MB
 
Figure 7.19 Viewpoint 2) Harestone Hill - Photomontage
4.55MB
 
Figure 7.20 Viewpoint 3) Redstone Rigg - Photomontage
5.55MB
 
Figure 7.21 Viewpoint 4) Twin Law Cairns - Photomontage
5.67MB
 
Figure 7.22 Viewpoint 5) Lammer Law - Photomontage
5.42MB
 
Figure 7.23 Viewpoint 6) Tollishil - Photomontage
5.24MB
 
Figure 7.24 Viewpoint 7) Priestlaw Hill - Photomontage
4.97MB
 
Figure 7.25 Viewpoint 8) Gifford - Photomontage (Part 1)
8.88MB
 
Figure 7.25 Viewpoint 8) Gifford - Photomontage (Part 2)
852KB
 
Figure 7.26 Viewpoint 9) Edgarhope Wood - Photomontage (Part 1)
8.42MB
 
Figure 7.26 Viewpoint 9) Edgarhope Wood - Photomontage (Part 2)
5.20MB
 
Figure 7.26 Viewpoint 9) Edgarhope Wood - Photomontage (Part 3)
6.70MB
 
Figure 7.26 Viewpoint 9) Edgarhope Wood - Photomontage (Part 4)
5.04MB
 
Figure 7.27 Viewpoint 10) Kirtonhil - Photomontage (Part 1)
9.16MB
 
Figure 7.27 Viewpoint 10) Kirtonhil - Photomontage (Part 2)
4.85MB
 
Figure 7.27 Viewpoint 10) Kirtonhil - Photomontage (Part 3)
6.94MB
 
Figure 7.27 Viewpoint 10) Kirtonhil - Photomontage (Part 4)
5.42MB
 
Figure 7.28 Viewpoint 11) A697_B6456Junction (Part 1)
8.05MB
 
Figure 7.28 Viewpoint 11) A697_B6456Junction (Part 2)
5.63MB
 
Figure 7.28 Viewpoint 11) A697_B6456Junction (Part 3)
7.58MB
 
Figure 7.28 Viewpoint 11) A697_B6456Junction (Part 4)
5.78MB
 
Figure 7.28 Viewpoint 11) A697_B6456Junction (Part 5)
5.78MB
 
Figure 7.29 Viewpoint 12) Traprain Law- Photomontage (Part 1)
9.31MB
 
Figure 7.29 Viewpoint 12) Traprain Law- Photomontage (Part 2)
6.08MB
 
Figure 7.29 Viewpoint 12) Traprain Law- Photomontage (Part 3)
8.03MB
 
Figure 7.30 Viewpoint 13) Minor road at Blacksmith Hill - Photomontage (Part 1)
8.12MB
 
Figure 7.30 Viewpoint 13) Minor road at Blacksmith Hill - Photomontage (Part 2)
5.60MB
 
Figure 7.30 Viewpoint 13) Minor road at Blacksmith Hill - Photomontage (Part 3)
6.96MB
 
Figure 7.30 Viewpoint 13) Minor road at Blacksmith Hill - Photomontage (Part 4)
5.51MB
 
Figure 7.30 Viewpoint 13) Minor road at Blacksmith Hill - Photomontage (Part 5)
5.51MB
 
Figure 7.31 Viewpoint 14) A6093 at Nisbet Junction - WF (Part 1)
9.64MB
 
Figure 7.31 Viewpoint 14) A6093 at Nisbet Junction - WF (Part 2)
6.72MB
 
Figure 7.31 Viewpoint 14) A6093 at Nisbet Junction - WF (Part 3)
8.52MB
 
Figure 7.32 Viewpoint 15) Lauder Common (Cairn) - Photomontage (Part 1)
9.07MB
 
Figure 7.32 Viewpoint 15) Lauder Common (Cairn) - Photomontage (Part 2)
5.01MB
 
Figure 7.32 Viewpoint 15) Lauder Common (Cairn) - Photomontage (Part 3)
5.86MB
 
Figure 7.32 Viewpoint 15) Lauder Common (Cairn) - Photomontage (Part 4)
5.86MB
 
Figure 7.33 Viewpoint 16) Pencaitland -Wireframe (Part 1)
2.80MB
 
Figure 7.33 Viewpoint 16) Pencaitland -Wireframe (Part 2)
7.96MB
 
Figure 7.33 Viewpoint 16) Pencaitland -Wireframe (Part 3)
9.42MB
 
Figure 7.34 Viewpoint 17) Oaktree Roundabout near Haddington - Wireframe (Part 1)
9.09MB
 
Figure 7.34 Viewpoint 17) Oaktree Roundabout near Haddington - Wireframe (Part 2)
7.46MB
 
Figure 7.34 Viewpoint 17) Oaktree Roundabout near Haddington - Wireframe (Part 3)
9.15MB
 
Figure 7.35 Viewpoint 18) Hopeteun Monument - Wireframe (Part 1)
8.19MB
 
Figure 7.35 Viewpoint 18) Hopeteun Monument - Wireframe (Part 2)
7.01MB
 
Figure 7.35 Viewpoint 18) Hopeteun Monument - Wireframe (Part 3)
8.74MB
 
Figure 7.36 Viewpoint 19) Tranent - Wireframe (Part 1)
2.29MB
 
Figure 7.36 Viewpoint 19) Tranent -Wireframe (Part 2)
7.33MB
 
Figure 7.36 Viewpoint 19) Tranent -Wireframe (Part 3)
8.75MB
 
Figure 7.37 Viewpoint 20) Hume Castle (Part 1)
9.88MB
 
Figure 7.37 Viewpoint 20) Hume Castle (Part 2)
5.17MB
 
Figure 7.37 Viewpoint 20) Hume Castle (Part 3)
1.34MB
 
Figure 7.38 Viewpoint 21) Auldhame - Wireframe (Part 1) 9.63MB
 
Figure 7.38 Viewpoint 21) Auldhame - Wireframe (Part 2)
6.12MB
 
Figure 7.39 Viewpoint 22) North Berwick Law - Wireframe (Part 1)
9.77MB
 
Figure 7.39 Viewpoint 22) North Berwick Law - Wireframe (Part 2)
5.38MB
 
Figure 7.40 Viewpoint 23) Torpichen Hill - Wireframe (Part 1)
8.10MB
 
Figure 7.40 Viewpoint 23) Torpichen Hill - Wireframe (Part 2)
6.02MB
 
Figure 7.41 Viewpoint 24) Eildon Hills - Wireframe (Part 1)
2.10MB
 
Figure 7.41 Viewpoint 24) Eildon Hills - Wireframe (Part 2)
6.56MB
 
Figure 7.42 360 Viewpoint 1) Dabshead Hill (Part 1)
8.61MB
 
Figure 7.42 360 Viewpoint 1) Dabshead Hill (Part 2)
9.48MB
 
Figure 7.42 360 Viewpoint 1) Dabshead Hill (Part 3)
1.97MB
 
Figure 7.43 360 Viewpoint 2) Twinlaw Cairn (Part 1)
1.97MB
 
Figure 7.43 360 Viewpoint 2) Twinlaw Cairn (Part 2)
6.97MB
 
Figure 7.43 360 Viewpoint 2) Twinlaw Cairn (Part 3)
7.30MB
 
Figure 7.43 360 Viewpoint 2) Twinlaw Cairn (Part 4)
7.35MB
 
Figure 7.43 360 Viewpoint 2) Twinlaw Cairn (Part 5)
6.73MB
 
Figure 7.44 360 Viewpoint 3) Lammerlaw (Part 1)
2.30MB
 
Figure 7.44 360 Viewpoint 3) Lammerlaw (Part 2)
8.25MB
 
Figure 7.44 360 Viewpoint 3) Lammerlaw (Part 3)
6.37MB
 
Figure 7.44 360 Viewpoint 3) Lammerlaw (Part 4)
6.21MB
 
Figure 7.45 RES VP) Byrecleugh Farm
3.50MB
 
Figure 7.46 RES VP) Byrecleugh Bothy
3.50MB
 
Figure 7.47 RES VP) Byrecleugh Cottage
3.51MB
 
Figure 7.48 RES VP) Byrecleugh Keepers House
3.52MB
 
Figure 7.49 RES VP) Trottingshaw
1.95MB
 
       
Volume 3 - Figures - Chapter 8 - Historic Environment      
ZTV 3.30MB
 
Non Designated Heritage Assets 1.48MB
 
Byrecleugh, Farmstead Part 1 1.61MB
 
Byrecleugh, Farmstead Part 2
8.94MB
 
Byrecleugh, Farmstead Part 3
8.94MB
 
Byrecleugh, Farmstead Part 4
8.80MB
 
VP CH Mutiny Stones Part 1 1.87MB
 
VP CH Mutiny Stones Part 2
8.22MB
 
VP CH Mutiny Stones Part 3
6.81MB
 
Dunside Hill 1.98MB
 
Kingside Hill 4.05MB
 
Dirrington Part 1 9.11MB
 
Dirrington Part 2 1.80MB
 
       
Volume 3 - Figures - Chapter 9 - Ecology      
Ecological Designated Sites 1.01MB
 
NVC Survey Map 2.71MB
 
       
Volume 3 - Figures - Chapter 10 - Ornithology      
 Location of Extension & Designated Ornithological Sites 2.33MB
 
Survey Areas in Breeding Seasons 2013 8.47MB
 
Survey Areas in Breeding Seasons 2014 4.34MB
 
2015 Breeding Wader Survey Area 3.70MB
 
Vantage Point Locations & Viewsheds 6.38MB
 
Raptor Flight Activity (All Seasons) 2.59MB
 
Wildfowl And Wader Flight Activity (Winter) 2.64MB
 
Wildfowl And Wader Flight Activity (Breeding) 2.57MB
 
Breeding Wader Territories Golden Plover 5.15MB  
Breeding Wader Territories Curlew 5.15MB  
Breeding Wader Territories 5.16MB
 
       
Volume 3 - Figures - Chapter 11 - Geology, Hydrology and Hydrogeology      
Hydrological Features 4.50MB
 
Solid and Drift Geology 3.63MB
 
Hydrological Constraints 2.09MB
 
       
Volume 3 - Figures - Chapter 12 - Noise      
Noise Monitoring Locations & Sensitive Receptors 6.79MB    
NSR1 West Hopes Noise Assessment 39KB
 
NSR2 Fasney Cottage Noise Assessment 39KB
 
NSR3 Killpallet Noise Assessment 38KB
 
NSR4 Byrecleugh Noise Assessment 40KB
 
       
Volume 3 - Figures - Chapter 13 - Traffic and Transport      
Construction Route 1.31MB
 
Traffic Survey Locations 1.32MB
 
PIA data 1.23MB
 
       
Volume 3 - Figures - Chapter 14 - Shadow Flicker      
Shadow Flicker Study Area 862KB
 
       
Volume 3 - Figures - Chapter 16 - Infrastructure, Telecommunications and Aviation      
Infrastructure and Telecommunications 1.00MB
 
       
Volume 4 - Appendicies      
Appendix 1A - Glossary and Abbreviations 39KB  
Appendix 2A - Updated ECDU Scoping Response 2.86MB
 
Appendix 2B - Summary of Scoping Responses 447KB  
Appendix 2C - Gatecheck Reports Part 1 7.52MB
 
Appendix 2C - Gatecheck Reports Part 2 8.48MB
 
Appendix 2C - Gatecheck Reports Part 3 4.79MB
 
Appendix 6A - Carbon Balance 1.68MB
 
Appendix 6B - Carbon Calcs 54KB
 
Appendix 7A - LVIA 214KB
 
Appendix 7B - LVIA
382KB
 
Appendix 7C - LVIA
64KB
 
Appendix 7D - LVIA
114KB
 
Appendix 8A - Historic Environment - Walkover Survey Report 1.04MB
 
Appendix 8B - Historic Environment - Designated Assets within 5km 26KB
 
Appendix 9A - Ecology - NVC 3.44MB
 
Appendix 9B - Ecology - Bats
3.77MB
 
Appendix 9C - Ecology - Protect Species
4.56MB
 
Appendix 9D - Ecology - Fish
2.27MB
 
Appendix 9E - Ecology - TWIC
6.86MB
 
Appendix 9F - Ecology - OLMP
4.49MB
 
Appendix 9G - Ecology - AA Screening
3.13MB
 
Appendix 9H - Ecology - PMP
8.37MB
 
Appendix 10A - Ornithology - Winter 2012-12 5.73MB
 
Appendix 10B - Ornithology - Breeding 2013 7.07MB
 
Appendix 10C - Ornithology - Winter 2013-14 9.91MB
 
Appendix 10D - Ornithology - Breeding 2014 3.09MB
 
Appendix 10E - Ornithology - Winter 2014-15 3.70MB
 
Appendix 10F - Ornithology - Breeding 2015 3.07MB
 
Appendix 10H - Ornithology - Collison Model 113KB
 
Appendix 11A - Geology - PSRA Part 1 8.91MB
 
Appendix 11A - Geology - PSRA Part 2
3.36MB
 
Appendix 11A - Geology - PSRA Part 3
9.61MB
 
Appendix 11B - Geology  23KB
 
Appendix 12A - Noise Terminology 25K  
Appendix 12B - Proposed Noise Assessment Methodology 594KB
 
Appendix 12C - Wind Turbine Manufacturer Data 747KB
 
Appendix 12D - Fallago 1 Wind Turbine Manufacturer Data
7.34MB
 
Appendix 13A - Site Specific Traffic Counts 143KB
 
Appendix 13B - Personal Injury Accident Data 335KB
 
Appendix 13C - Scottish Trop End Program Output Data 112KB
 
Appendix 13D - Abnormal Road Assessment Part 1 5.86MB
 
Appendix 13D - Abnormal Road Assessment Part 2
4.81MB
 
Appendix 13D - Abnormal Road Assessment Part 3
5.97MB
 
Appendix 13D - Abnormal Road Assessment Part 4
9.18MB
 
Appendix 13D - Abnormal Road Assessment Part 5
8.83MB
 
Appendix 13D - Abnormal Road Assessment Part 6
8.30MB
 
       
Volume 5 - Planning Statement      
Volume 5A Planning Statement 627KB    
Volume 5B Planning Statement 5.78MB
 
       
Volume 6 - Design and Access Statement      
Design & Access Statement - Part 1 7.67MB
 
Design & Access Statement - Part 2 3.62MB
 
Design & Access Statement - Part 3
7.49MB
 
Design & Access Statement - Part 4
7.48MB
 
Design & Access Statement - Part 5
7.48MB
 
Design & Access Statement - Part 6
7.48MB
 
Design & Access Statement - Part 7
6.89MB
 
       
Volume 7 - PAC Report      
PAC Report 8.40MB
 
       
Volume 8 - Borrow Pit Assessment      
Borrow Pit Assessment 4.74MB
 











3.1MB
4.07MB



Project Contact

project contact details

EDF Energy Renewables
Alexander House
1 Mandarin Road
Rainton Bridge Business Park
Houghton le Spring
SUNDERLAND
DH4 5RA

Email: info@edf-er.com

Tel: 0800 0566650

Latest News Teesside

Latest News

  • Please visit our latest news section for more information.

© EDF Energy 2017. All rights reserved.